Last updated: January 2026 · 10 min read
San Francisco Building Guide
If you're planning any construction, renovation, or demolition projects in San Francisco, you'll likely need to obtain a Building permit from the Department of Building Inspection (DBI). These permits ensure your work meets local safety and zoning requirements.
Need help navigating San Francisco permits? Connect with licensed contractors who handle permits for you →
What Requires a Building in San Francisco
In San Francisco, a Building permit is required for a wide range of construction projects, including new builds, additions, alterations, and demolitions. The DBI requires a permit for any work that changes the physical structure of a building, including electrical, plumbing, or mechanical system upgrades. Even minor changes like window or door replacements may necessitate a permit. The specific requirements depend on the scope and cost of your project, so it's best to check with the DBI to determine if your work needs approval.
What Doesn't Require a Permit
While many construction projects in San Francisco require a Building permit, there are some exemptions. Minor repairs, such as painting, flooring, or cabinet replacements, generally do not need approval if the work costs less than $1,000 and doesn't affect the building's structure or safety systems. Additionally, detached one-story accessory structures under 120 square feet may be exempt from permitting requirements. However, it's always best to consult with the DBI to confirm if your specific project qualifies for an exemption.
Building Costs and Fees in San Francisco
The fees for a Building permit in San Francisco can vary widely depending on the scope and cost of your project. The base permit fee starts at $833, but additional charges may apply. For example, the Building Permit Base fee ranges from $182 for projects up to $2,000 in value to $531,050 for projects over $200,000,001. There are also tiered fees for factors like new construction, excavation, and permit issuance. The DBI also charges a 1% surcharge for the City's Lead Safe Work Program on buildings constructed before 1979. To get an accurate cost estimate, you'll need to provide details about your project to the DBI.
How Long Does Building Approval Take
The timeline for obtaining a Building permit in San Francisco can vary depending on the complexity of your project and the DBI's current workload. According to the DBI, the average processing time for a standard building permit is 5-12 weeks. However, permits for larger or more complex projects can take several months. To expedite the process, the DBI offers a Priority Permit Review option for an additional fee. With this service, the DBI aims to complete the initial review within 10 business days.
Required Documents for San Francisco Building
When applying for a Building permit in San Francisco, you'll need to submit a comprehensive set of documents to the DBI. This typically includes construction plans, specifications, and engineering calculations sealed by a licensed professional. You'll also need to provide a site plan, elevations, and details on any proposed structural changes. The DBI has specific requirements for plan size, scale, and format, so be sure to review their guidelines before submitting your application.
Step-by-Step Application Process
The process for obtaining a Building permit in San Francisco involves several steps. First, you'll need to submit your completed application and supporting documents, either in person at the DBI office or through their online SFDBI Portal. The DBI will then review your plans to ensure they comply with local building codes and zoning regulations. Once your permit is approved, you can begin construction, but you'll need to schedule mandatory inspections at various stages of the project.
- 1
Prepare Your Documents
Gather all required plans, specifications, and supporting documents as outlined by the DBI. Ensure they meet the department's formatting and content requirements.
- 2
Submit Your Application
Apply for your Building permit either in person at the DBI office or through the online SFDBI Portal. Be prepared to pay the applicable fees at the time of submission.
- 3
DBI Review and Approval
The DBI will review your application and supporting documents to ensure compliance with local building codes and zoning regulations. They may request additional information or revisions during this process.
- 4
Schedule Inspections
Once your permit is approved, you'll need to schedule mandatory inspections at various stages of the construction process. Be sure to pass all required inspections before proceeding with your project.
- 5
Obtain Final Approval
After successfully completing all inspections, the DBI will grant final approval for your project. You can then begin or continue construction work.
Required Inspections
During the construction process, the DBI will require several mandatory inspections to ensure your project meets all safety and code requirements. These typically include foundation, framing, electrical, plumbing, and final inspections. Depending on the scope of your work, additional specialized inspections may be necessary, such as for fire safety systems or accessibility features. It's important to schedule these inspections with the DBI and pass each one before moving on to the next stage of construction.
Common Building Permit Mistakes in San Francisco
One of the most common mistakes homeowners make in San Francisco is starting a project without obtaining the necessary building permit. This can result in hefty fines from the Department of Building Inspection (DBI) and even the requirement to undo any unpermitted work. Another frequent error is underestimating the timeline for the permit process. The DBI often faces a backlog, so homeowners should account for several months between submitting an application and receiving approval. Additionally, many San Francisco residents fail to factor in the cost of permit fees, which can add thousands of dollars to a project's budget. Ignoring safety requirements, such as seismic upgrades or lead-safe work practices, is another pitfall that can delay projects or lead to compliance issues down the line.
Sample Building Permit Cost Calculation
Let's consider the case of a San Francisco homeowner planning a 1,500 square foot renovation and an 800 square foot Accessory Dwelling Unit (ADU). Based on the fee data provided, the base permit fee for the renovation would be $3,504, plus an additional $516 for the first $10,000 of construction value and a variable rate of 0.05274% for any amount over $10,000. For the 800 square foot ADU, the base permit fee would be $3,502, plus the same variable rate for construction value. The homeowner would also need to account for a $833 base permit fee, a $10,855 community plan evaluation fee, and a $12,202 site circulation review fee. Finally, there would be inspection fees ranging from $640 to $144, depending on the project size, and administrative fees of $136 to $227. In total, the estimated permit costs for this project would be approximately $35,000 to $40,000.
How San Francisco Compares to Other California Cities
Compared to other major California cities, San Francisco's building permit process can be more complex and costly. In Los Angeles, the permit application and review timeline is generally faster, with a target of 21 business days for most residential projects. However, San Francisco's fees are typically lower, with a base permit cost of $833 compared to $1,140 in Los Angeles. San Diego's building permit process is similar to San Francisco's in terms of timeline, but the fees are generally more straightforward, with a flat rate based on the project's value. In contrast, San Francisco's fees are tiered and can vary significantly depending on the project details. Finally, San Jose's permit process is known for being more streamlined, with an online portal and a faster turnaround time, although the fees may be higher for larger projects.
Recent Building Permit Changes in San Francisco
In 2024, the San Francisco Department of Building Inspection (DBI) introduced a new online portal to streamline the permit application and review process. This system allows homeowners to submit documents, track the status of their application, and make payments electronically. Additionally, the DBI has implemented several updates to the city's building codes to align with the 2022 California Building Code, which includes new energy efficiency and sustainability requirements. These changes, such as updates to Title 24 standards, will affect the design and construction of all new buildings and major renovations in San Francisco. Finally, the DBI has increased its staff to address the ongoing backlog of permit applications, which should help to reduce processing times for homeowners in the coming years.
Tips for Faster Approval in San Francisco
To expedite the Building permit process in San Francisco, there are a few key tips to keep in mind. First, make sure your plans and documents are complete and accurate, as incomplete or incorrect submissions are a common reason for delays. Additionally, consider utilizing the DBI's Priority Permit Review service, which can significantly shorten the initial review timeline. Finally, stay in close communication with the DBI throughout the process and be responsive to any requests for additional information or revisions. Following these guidelines can help ensure your Building permit is approved as quickly as possible.
Frequently asked questions about San Francisco building permits
How much does a Building cost in San Francisco?
The fees for a Building permit in San Francisco can vary widely depending on the scope and cost of your project. The base permit fee starts at $833, but additional charges may apply. For example, the Building Permit Base fee ranges from $182 for projects up to $2,000 in value to $531,050 for projects over $200,000,001. There are also tiered fees for factors like new construction, excavation, and permit issuance.
How long does it take to get a Building in San Francisco?
The timeline for obtaining a Building permit in San Francisco can vary depending on the complexity of your project and the DBI's current workload. According to the DBI, the average processing time for a standard building permit is 5-12 weeks. However, permits for larger or more complex projects can take several months. To expedite the process, the DBI offers a Priority Permit Review option for an additional fee, with the goal of completing the initial review within 10 business days.
Can I apply for a Building online in San Francisco?
Yes, you can apply for a Building permit in San Francisco through the DBI's online SFDBI Portal. This allows you to submit your application and supporting documents electronically, rather than having to visit the DBI office in person.
Do I need a contractor for a Building?
In San Francisco, you have the option to either hire a licensed contractor or serve as an owner-builder for your Building project. If you choose the owner-builder route, you'll need to meet certain requirements and take on the responsibility for ensuring the work complies with local building codes and regulations.
What happens if I build without a permit in San Francisco?
Building without a required permit in San Francisco can result in significant penalties and enforcement actions from the DBI. Unpermitted work may be subject to fines, stop-work orders, or even the requirement to demolish or remove the unauthorized construction. To avoid these consequences, it's crucial to obtain the necessary Building permit before starting any construction or renovation projects.
What's the biggest mistake people make with Building permits in San Francisco?
The biggest mistake homeowners make in San Francisco is starting a project without obtaining the necessary building permit from the Department of Building Inspection (DBI). This can result in hefty fines and the requirement to undo any unpermitted work.
How do San Francisco Building permit costs compare to other cities?
San Francisco's building permit fees are generally higher than other major California cities like Los Angeles and San Diego, but lower than San Jose. The fees in San Francisco are also more complex, with a tiered structure that can vary significantly depending on the project details.
Ready to start your Building project in San Francisco?
Get matched with licensed contractors who handle permits
Related Permits in San Francisco
San Francisco Building Department Contact
Department of Building Inspection
49 South Van Ness Ave, San Francisco, CA 94103